

Fri, Feb 28
|NE 1st Ct, Miami, FL 33132, USA
Behind The Scenes: I-395/SR 836/I-95 Design-Build Project
Tour participants will get a first-hand look at how the I-395 signature bridge is coming together. They will gain insight into what it takes to construct a structure that will enhance safety, mobility, and access and change the downtown Miami skyline for generations.
Time & Location
Feb 28, 2025, 9:30 AM – 10:30 AM
NE 1st Ct, Miami, FL 33132, USA
About the event
About the Event:
The I-395/SR 836/I-95 Design-Build Project will enhance three of the City’s crucial arteries converging at the SR 836/I-395/I-95 (Midtown) Interchange. The Midtown Interchange, with an Annual Average Daily Traffic (AADT) of approximately 450,000 vehicle trips, is the vital junction that serves residents and tourists as they make their way to major special events venues, tourist destinations, health district, court facilities as well as the vibrant downtown area and communities such as Overtown and Edgewater. The project will include several firsts for the area, such as the double-decking of an elevated bridge (SR 836), the construction of an iconic, six-arched signature bridge that will span approximately 1000 feet over Biscayne Boulevard and NE 2 Avenue, and the creation of 33 acres of community spaces in coordination with the City of Miami.
Tour participants will get a first-hand look at how the I-395 signature bridge is coming together. They…
Tickets
General Admission
$0.00Sold Out
This event is sold out